Production Line


Zhejiang Minxing Packaging Materials Technology Co., Ltd. factory production line 0

With a 39,000 sqm factory, we specialize in producing primary food-contact packaging and secondary packaging for pharmaceutical & cosmetic industries in 100,000-class cleanrooms.

Certifications:

✔ ISO 9001:2015 (Quality Management)

✔ HACCP & ISO 22000 (Food Safety)

✔ ISO 45001 (Occupational Health & Safety)

✔ SA 8000 (Social Accountability)

Committed to safe packaging, employee well-being, and corporate social responsibility, we ensure sustainable development through optimized workplaces and reduced occupational risks.


OEM/ODM


Zhejiang Minxing Packaging Materials Technology Co., Ltd. factory production line 0


With 36 years of experience in custom blister packaging, Minxing Packaging offers end-to-end solutions—from design and mold development to production and logistics. 

Our dedicated team of 10+ mold design and tooling engineers and in-house prototyping department ensure high precision, faster turnaround, and cost-effective packaging solutions

Custom Design & Tooling – In-house expertise for seamless production  
Fast Prototyping – Accelerate your product launch  
One-Stop Service – Design → Mold → Production → Delivery  
36-Year Reliability – Trusted by global brands


Custom Manufacturing Workflow

(ISO 9001:2015 Certified Process)


Phase 1: Design Specification Lockdown

  • Step 1.1 RFQ Analysis

Material (PET/PVC/PP/PS or others, thickness/weight)

Dimension (outside dimension of the packaging or packed product)

Surface Finish (if needed)

  • Step 1.2 Offering Quotation

Quotation offered based on MOQ or needed quantity within 24h

Phase 2: Rapid Prototyping

  • Option A: 1-5pcs samples needed

Lead Time: 5-7 days after drawing confirmed

Fees: US$50 - US230

  • Option B: More than 5pcs samples needed

To advise needed samples quantity to check sample fees and lead time.

Phase 3: Sample Verification

Phase 4: Mass Production

  • Stage 4.1 Mold Processing

Mold Fee: To be advised as the size of the packaging.

Lead time: 7-12 days for 2-station forming machine. 25-25 days for 3

  • Stage 4.2 Production

Phase 5: Logistics & Support

  • Service 5.1 in FOB/CFR/CIF Term
  • Service 5.2 in DDP term

 

R&D

We have a professional R&D team in the field to provide products with the best quality and high stability. Cooperating with well-known institutions of higher learning and research institutions at home and abroad. A number of the core technological achievements and technical indicators at the international advanced level.